Epochal Juice - Year long Senior Capstone

28d1f4a24080387c9641624e83cb7fcb.png

I created a naming convention and contact sheet for our team, as well as setting up our pre-production deadlines in shotgun

I managed our team's google drive and discord where we posted updates and exchanged files

56347c8b44ff56120d79472c257cbc14.png
e829337b60b3e4191709365eb7d5c734.png
f0b3f0a9c0a422642001cb2bd1d833fe.png

In pre-production and production we used responsibility sheets twice a week with each team-member's tasks

I also created three Gantt charts for my team in each 10 week period so we could keep track of upcoming deadlines

13c2a888b305c58db828bbd9b8c4bb81.png
9c02855d426aca9eb3e242e45d51a6b8.png
a4562e8221d88e4ac22192fad5cfdd67.png

When assigning everyone's shots for production, the director and I sorted out everyone's shots in Adobe After Effects with color coding so we could make sure the workload was even between the team

8198302b5244d089dc6087b6829d4dec.png
cb95b19bf425d82e5fe3aca753b8742d.png
36eb198e34557a1054ab6b959c6315b1.png
df0877a214b3ff4a01039a4a82aa353a.png
65b455e11589db57d23582691f2c632c.png
5f5f25462555cb29b4bfc89543106d8d.png
7c3e4b79a44570fe6a09d1b890ed91ae.png

This is our team's scene list, where we kept track of the status of each shot and important notes

53e5f4483d86b6cc23dc6a9584b7cd16.png

In production, to help juggle the massive workload I created an additional calendar with everyone's weekly tasks.

61b6c80906aeec68b14c0d3202e60e6d.png

In post-production we used a more list oriented schedule to keep track of things as this format was preferred by the team.

c307d9586acddae0c8cdd14990431aff.png
c577201dbd5d00cf4b728789aa8d66f5.png

Throughout the course of the year the director and I made additional documents to help with organization such as this one where we tracked the status of the layouts. We made similar ones for compositing, and times we were in a crunch.